Revit Level command

Shortcut: LLDatum

Creates a horizontal datum that hosts elements, drives plan views and constrains walls, floors and columns.

Syntax

LL → draw in a section or elevation → rename → set the elevation

Step by step

  1. Open a section or elevation view — levels cannot be drawn in plan.
  2. Type LL.
  3. Draw the level, keeping Make Plan View ticked if a plan is needed.
  4. Rename it to the project standard, accepting the prompt to rename corresponding views.
  5. Type the exact elevation in the level's temporary dimension or properties.

Adding a mezzanine level

In the north elevation draw Level 1M at +3600, allow the plan view to be created, then set the mezzanine walls' base constraint to it. Constrained elements follow any later change to that height.

Common mistakes

  • Copying a level rather than using the Level tool, which skips creating plan views.
  • Renaming a level without renaming its views, leaving mismatched sheet names.
  • Moving levels while elements are unconstrained, which silently leaves geometry behind.

Questions

Why can't I draw a level in a plan view?

Levels are horizontal datums, so they only appear as a line in vertical views. Open a section or elevation to create one.

Do I need to rename views when renaming a level?

Accept the prompt. Matching names keep the browser and sheet references readable for everyone else on the model.

Related commands